Safe work method statements
A maintained SWMS library covering our high-risk construction work — work at height, demolition and break-out, hazardous dust (silica), plant operation, public interface. Reviewed per project, not photocopied per project.
Inspection & test plans
Every scope carries an ITP with hold and witness points — substrate sign-offs, reinforcement treatment, membrane details — photographed and compiled into the completion report.
Public & occupant protection
Exclusion zones, overhead protection, protected access paths and notification protocols for occupied buildings — planned in the methodology, priced in the scope, auditable on site.
Silica & hazardous materials
Concrete break-out is silica work: controlled cutting, extraction, air monitoring where required, and compliance with current crystalline silica regulation. Asbestos-era buildings surveyed before disturbance.
Work at height systems
Engineered access per elevation — rope access under IRATA systems, EWP and scaffold with certified inspections, anchor certification records maintained.
Quality management
Documented QA procedures aligned to ISO 9001 practice; formal certification status (ISO 9001 / ISO 45001) is a Phase 0 confirmation item and will be displayed here as held or as roadmap.
Safety documentation summaries and certificates are available to clients on request — and provided unprompted at contract.